Solutions  ·  Infrastructure Project Management

Connect capital plans, field progress, and financial control.

Translate approved capital plans into a project baseline and connect recorded field activity to material usage and financial actuals. Xect AI helps project teams identify variances, coordinate replenishment, and review invoice exceptions against supporting records.

Planned vs. actual BOM reconciled by hand at month-endPurchase orders cut only after a foreman calls in a shortageField progress typed into a tablet, days behind ground truth
Telemetry Agent actualizes task progress the moment equipment reports itSupply Chain Agent proposes the PO before the critical path runs dryEvery foot of BOM burn traced to its task and ERP ledger code
Explore

Infrastructure Project Management,
from every angle

From a tablet update three days late
to a ledger reconciled the same day

Field progress, material burn and ERP status live in three different systems, so the schedule can lag ground truth by days. Xect AI binds every Work Breakdown Structure (WBS) task to the telemetry the equipment is already streaming, and reconciles verified actuals to the ERP the same day they're recorded.

 Today
Field progress typed into a tablet, days behind ground truth
Planned vs. actual BOM reconciled by hand at month-end
Purchase orders cut only after a foreman calls in a shortage
Subcontractor invoices disputed line by line, from memory
 With Xect AI
Telemetry Agent actualizes task progress the moment equipment reports itAgents
Variance & CPP Agent flags any task burning past 105% of its planned BOMEvents
Supply Chain Agent drafts the purchase order before the critical path runs dryFlows
ERP Sync Agent matches telemetry-verified invoices for approval, tickets the restGovernance
How it works

CPP approval to reconciled actuals, in four moves

01 · Baseline
02 · Track
03 · Restock
04 · Reconcile
01

Establish the project baseline

The moment a Capital Project Plan (CPP) is approved, the Variance & CPP Agent pulls its budget, scope, planned Bill of Materials (BOM) and target dates, and generates the Work Breakdown Structure (WBS) against similar historical builds. The Project Controller reviews and locks the baseline; any deviation from here needs a formal change order.

Event ListenerAI Agent
02

Track

Directional drills, fusion splicers and drone scans stream footage, splice counts and volume moved straight into the WBS. The Telemetry Agent converts that into task-level percent complete and deducts the matching materials from site inventory, with no one typing an update.

TelemetryPolicy
03

Restock

The Supply Chain Agent watches burn rate against the remaining planned BOM for every active task, and drafts the purchase order before a shortage reaches the critical path. A Procurement Manager approves it through a single HITL ticket.

FlowApproval
04

Reconcile

The ERP Sync Agent compares every subcontractor invoice against telemetry-verified completion, matches the ones that align and routes them to the Financial & ERP Admin for voucher approval, then pushes validated actuals to the ERP under the correct ledger code. A mismatch pauses the sync and opens an exception ticket instead.

ERP SyncTrace

The four agents that run CPP to cash

Each agent owns one step in the baseline-to-reconciliation path above and hands off cleanly to the next, with a human approval gate at every exception.

What changes when the ledger closes the gap the same day

The WBS drafts itself the moment the CPP is approved

0
CPP status flip to a draft WBS, ready for PM review

The Variance & CPP Agent builds phases, tasks, durations and cost codes from the approved capital plan and matching historical builds. The Project Controller reviews a complete schedule instead of building one.

BOM overruns caught before they reach the ledger

105%
planned BOM burn threshold that opens a HITL ticket automatically

The Variance & CPP Agent compares real-time material burn against the CPP baseline continuously, and opens a HITL ticket for the Project Controller the moment a task crosses a configurable threshold (105% by default), weeks before a month-end reconciliation would have caught it.

Zero manual progress updates for telemetry-bound tasks

0
tablet entries for tasks bound to equipment telemetry

Directional drills, fusion splicers and drone scans report footage, splice counts and volume moved directly into the WBS. No one keys in a percent-complete by hand.

Project health calculated continuously, not reported weekly

Live
SPI & CPI recalculated from telemetry, not a weekly rollup

Schedule Performance Index (SPI) and Cost Performance Index (CPI) recalculate the moment new telemetry lands, replacing a manually rolled-up status report. Predictive delay flags fire from actual burn rate.

When the drill reports 620 feet, the task shows 620 feet of recorded progress, pending quality and acceptance review. When an invoice claims more, the ledger finds out before the check does.

One baseline engine, every kind of build

Fiber & Broadband ISPs

Directional boring and fusion splicing telemetry actualize trenching and splice tasks in real time, and the same geocoded data formats into BDC-ready reporting for the compliance team to validate and submit.

See the industry page

Data Center & Hyperscale Construction

A multi-building campus CPP becomes one cost-coded WBS across every trade, and the Variance & CPP Agent stops an overallocated conduit or busway run before it ever reaches procurement.

Talk to us about data center builds

Public Utility & Municipal Infrastructure

A capital plan for a water, power or gas build generates its WBS the same way a fiber build does, and the Telemetry Agent binds progress to whatever the crew's equipment already reports, boring log or flow meter alike.

Talk to us about public utility builds

Heavy Civil & Underground Contractors

Multiple concurrent job sites report boring, trenching and equipment hours into one EPM dashboard, so a general contractor sees every crew's Earned Value against the same baseline, not four spreadsheets.

Talk to us about heavy civil builds

Built for the people who own the baseline, the burn and the books

Field Superintendent

Stops tapping progress into a tablet, days behind reality

Owns what's happening on the ground, and shouldn't be the one keying in percent-complete after the drill already reported it. The Telemetry Agent actualizes tasks the moment equipment streams the data, and flags anything recorded outside the project's geofence.

Task progress updates automatically from drill, splicer and drone telemetry
HITL ticket if telemetry contradicts the site's active schedule or zone
Full as-built and BDC-ready location data as a byproduct of the build
Project Controller

Sees a BOM overrun the day it happens, not at month-end

Owns the planned-vs-actual comparison, and shouldn't wait for a monthly reconciliation to learn a task burned through its material budget. The Variance & CPP Agent compares real-time burn against the locked CPP baseline continuously.

Real-time Planned vs. Actual BOM and schedule variance, task by task
HITL ticket the moment burn crosses 105% of the planned BOM
Every change to the baseline routed through a formal change order
Procurement Manager

Approves the purchase order, instead of chasing the shortage

Owns material availability across every active site, and shouldn't find out about a critical-path shortage from a foreman's phone call. The Supply Chain Agent drafts the purchase order from live burn rate and routes it for approval before the site runs dry.

Purchase orders drafted from live inventory burn rate, before the shortage hits
Every automated PO approved through a single HITL ticket
Full visibility into burn rate across every concurrent job site
Financial & ERP Admin

Closes the books on verified actuals, not disputed paperwork

Owns getting clean data into the ERP, and reviews subcontractor invoices against telemetry-verified completion instead of a foreman's notes. The ERP Sync Agent matches invoices to that telemetry and routes them for voucher approval, flagging only the mismatches for deeper investigation.

Validated actuals pushed to the ERP under the correct ledger code automatically
Exception ticket the instant an invoice outpaces what telemetry verified
Full audit trail from CPP baseline to the final ERP entry

Reconcile the build the same day it happens.

Book a 30-minute demo and see Xect AI turn a CPP into a locked WBS, actualize a task from live telemetry, and reconcile the invoice against it.